1 Mar
2013
Posted in: Proyek
By    No Comments

Hotel Best Western OJ Malang

NextGen ScrollGallery thumbnailNextGen ScrollGallery thumbnail
a
e
 
Proyek: Hotel Best Western OJ Malang

Lokasi: Jl. Cipto No. 11 Malang
Pekerjaan: Acp Ferrobond
Periode: Nopember 2012 – Februari 2013
Hotel 10 lantai ini terdiri dari :
  • Lobby di Lt. Dasar
  • Parking Area di Lt. 1-2
  • Meeting Room & Swimming Pool di Lt. 3
  • SPA di Lt. 4
  • Area Pengembangan di Lt. 5
  • Ruang Hotel di Lt. 6-10
  • Communal Space di Lt. Atap
Pekerjaan Curtain Wall & Aluminium Composite Panel proyek ini kita mulai di pertengahan bulan Nopember 2012. Curtain Wall menggunakan type back mullion 40×100 powder coating, kaca stopsol super silver blue tebal 8 mm ex. Asahimas. Aluminium Composite Panel menggunakan produk Alumebond tebal 4 mm alum sheet 0.3 finish PVDF.
 

 

Comments are closed.